The brand on the box matters far less than the size of the system and the quality of the install. Here is what actually determines whether a new system performs, and what a proper quote has to show you.
Call 832-662-4107
The most consequential decision in a new system is not which badge is on it. It is whether it is the right size, and the most common error is oversizing.
A system too large cools the house to temperature quickly and shuts off. That sounds efficient and is the opposite. Air conditioning removes humidity by running, and in Houston humidity is half the comfort problem. A short-cycling oversized unit leaves a house that is cold and clammy, and it wears the compressor out faster through repeated starts.
Proper sizing comes from a Manual J load calculation — square footage, insulation, window area and orientation, ceiling height, duct condition. If a contractor sizes your system by looking at the old one or by square footage alone, they are guessing. Ask to see the calculation.
Since January 2025, new residential systems use R-454B rather than R-410A, following the EPA's global warming potential cap under the AIM Act. A new system today is on the current platform, which is the right side of that transition to be on.
It also means a new system is not compatible with your old refrigerant, and the two cannot be mixed or converted. That is normal and expected — it simply means replacement is a whole-system decision rather than a part swap.
This is the part the industry underplays. A high-efficiency system installed badly will underperform a mid-range system installed well, and most of the difference is in things you cannot see from the driveway.
| Line | Why it matters |
|---|---|
| Manual J load calculation | The basis for the size. Ask for it in writing |
| Equipment model numbers | Indoor and outdoor both. They must be a matched pair or the rated efficiency is fiction |
| Duct work included or excluded | The largest hidden cost in most replacements |
| Permit | Replacement requires one. A contractor skipping it is skipping inspection |
| Labour warranty separate from parts | Manufacturers warrant parts. Labour is the contractor's own promise |
| Old equipment removal and disposal | Including refrigerant recovery, which is legally required |
If the choice is yours, replace in spring or autumn. Summer in Houston means the longest waits, the least scheduling flexibility and the least room to negotiate. A system limping through August that you already know is finished is better replaced in October than in next July's emergency.
Call 832-662-4107